User Tools

Site Tools


en:infra-convert:user:terms

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
Next revision Both sides next revision
en:infra-convert:user:terms [2019/10/02 14:13]
me [Measurement (sizes-)]
en:infra-convert:user:terms [2019/10/08 14:51]
me
Line 31: Line 31:
  **M**\\ ​  **M**\\ ​
  • [[en:​infra-convert:​user:​terms#​Measurement (sizes-)]]\\ ​  • [[en:​infra-convert:​user:​terms#​Measurement (sizes-)]]\\ ​
 + **N**\\ ​
 + • [[en:​infra-convert:​user:​terms#​Numerical precision]]\\ ​
  **P**\\ ​  **P**\\ ​
  • [[en:​infra-convert:​user:​terms#​Project]]\\ ​  • [[en:​infra-convert:​user:​terms#​Project]]\\ ​
  **S**\\ ​  **S**\\ ​
 + • [[en:​infra-convert:​user:​terms#​Simplified indications]]\\ ​
  • [[en:​infra-convert:​user:​terms#​Specification operators and modifiers (ISO GPS)]]\\ ​  • [[en:​infra-convert:​user:​terms#​Specification operators and modifiers (ISO GPS)]]\\ ​
  • [[en:​infra-convert:​user:​terms#​Stamp/​stamps]]\\ ​  • [[en:​infra-convert:​user:​terms#​Stamp/​stamps]]\\ ​
Line 616: Line 619:
 | NIST-19: National Institute of Standards and Technology, Gaithersburg,​ Maryland, USA: NIST Handbook 44 : Specifications,​ Tolerances, and Other Technical Requirements for Weighing and Measuring Devices (Appendix C. General Tables of Units of Measurement) 2019.\\ *¹ Available from program version 1.2.0.23\\ *² Available from program version 1.3.9.5\\ *³ Available from program version 1.3.9.8 ||||| | NIST-19: National Institute of Standards and Technology, Gaithersburg,​ Maryland, USA: NIST Handbook 44 : Specifications,​ Tolerances, and Other Technical Requirements for Weighing and Measuring Devices (Appendix C. General Tables of Units of Measurement) 2019.\\ *¹ Available from program version 1.2.0.23\\ *² Available from program version 1.3.9.5\\ *³ Available from program version 1.3.9.8 |||||
  
 +\\ 
  
 +----
 +
 +\\ 
 +
 +==== Numerical precision ====
 +
 +The numerical precision is relevant for the representation of numerical values. If a technical fact is described with numerical values, usually in the form of physical quantities or →[[en:​infra-convert:​user:​terms#​measurement_sizes|measurement sizes]], the 
 +accuracy of the displayed number should be in the same order of magnitude as the inaccuracy of the measure itself.
 +
 +For example, the maximum inaccuracy range of the value 23, if no further information is available, is 22.5 to <23.5. Finally, the value may have resulted from a rounding operation. The last significant digit, here the "​3",​ is the digit that was rounded or may have been rounded.
 +
 +|< 100% 15% 15% 30% 25% 15% >|
 +^  Value  ^  Number of relevant digits ​ ^  Rounding range (absolute inaccuracy range) ​ ^  Size of the absolute inaccuracy range  ^  Size of relative inaccuracy ​ ^
 +|  2**3** ​ |  2  |  22,5 to <​23,​5 ​ |  1  |  4,35 %  |
 +|  2,​**3** ​ |  2  |  2,25 to <​2,​35 ​ |  0,1  |  4,35 %  |
 +|  23,​**0** ​ |  3  |  22,95 to <​23,​05 ​ |  0,1  |  0,435 %  |
 +|  2**3**00 ​ |  2  |  2250 to <​2350 ​ |  100  |  4,35 %  |
 +|  0,​00023**0** ​ |  3  |  0,0002295 to <​0,​0002305 ​ |  0,​000001 ​ |  0,435 %  |
 +
 +The number of significant or relevant digits in a decimal number can be identified as follows (see also "DIN EN ISO 80000-1:​2013-08,​ Chapter 7.3.4 Deviation and uncertainty"​):​
 +
 +  - The number is viewed from left to right. The first non-zero digit is the first relevant digit.
 +  - Following zeros are also relevant, especially if they are to the right of the decimal point.
 +  - Zeros to the left of the comma are only relevant if at least one other digit, including zero, follows to the right of the comma.
 +
 +The numerical accuracy common in technology ("​slide rule accuracy"​) is achieved by rounding a value so that three significant digits remain. Unless the first significant digit is a one, four significant digits should remain.
  
 \\  \\ 
Line 642: Line 672:
  
 Even if it is technically possible, a project should always only refer to an object that is subject to a test and, if necessary, follow-up tests. This may be, for example, the initial sampling of a product and its subsequent re-sampling (first-piece approvals, requalifications). Even if it is technically possible, a project should always only refer to an object that is subject to a test and, if necessary, follow-up tests. This may be, for example, the initial sampling of a product and its subsequent re-sampling (first-piece approvals, requalifications).
 +
 +\\ 
 +
 +----
 +
 +\\ 
 +
 +==== Simplified indications ====
 +
 +By using a **simplified specification**,​ requirements for a geometry element are specified in simplified form and explained elsewhere in the drawing, for example next to a view or near the title block. This type of specification can be useful if there is not enough space available in a view or if a specification applies to several separate geometry elements and is specified more than once.
 +
 +The following example shows the principle for surface specifications and geometric tolerance specifications.
 +
 +{{ :​en:​infra-convert:​user:​terms:​vereinfachte_angaben.png?​nolink&​600 |}}
  
 \\  \\ 
en/infra-convert/user/terms.txt · Last modified: 2023/10/20 16:02 by me